Hydraulic steel structure logo.gif (3626 Byte)

There was a paper presented at the 12th International Seminar on Hydropower Plants at the Vienna University of Technology in 2002 regarding the refurbishment of the steel water construction of HPP Vila Viçosa. The paper can be downloaded in pdf-format below.
 
-------> Conference paper (~950kB)
 
Flap gates
HPP Retznei HPP Retznei >> more  
         
HPP Hönigtal HPP Hönigtal >> more  
         
HPP Vila Viçosa HPP Vila Viçosa (PORTUGAL) >> more  
         
Weir Eggersdorf Weir Eggersdorf >> more  
         
HPP Gisse HPP Gisse >> more  
         
HPP Diemlach HPP Diemlach >> more  
         
HPP Trattlerhof HPP Trattlerhof >> more  
         
Gates with flap gate
HPP Leoben HPP Leoben >> more  
         
KW Murau HPP Murau >> more  
         
Screens
HPP Kreuzbergmaut HPP Kreuzbergmaut >> more  
         
HPP Leoben HPP Leoben >> more  
         
HPP Reutte HPP Reutte >> more  
         
Stop logs
HPP Retznei HPP Retznei >> more  
         
HPP Diemlach HPP Diemlach >> more  
         
HPP Leoben HPP Leoben >> more  
         
HPP Rosegg HPP Rosegg >> more  
 
The shown projects just give an overview. For a full list of all projects see the reference list.
 

© Copyright Radhuber Consulting,
Last update 13.03.2012