Hydraulic steel structure Hönigtal Hydropower Plant logo.gif (3626 Byte)

The Hydropower Plant Hönigtal is the last one in a chain of four Run-off-river plants at the river Mürz. This whole chain was refurbished between 1988 and 1989. HPP Hönigtal is situated near the city of Krieglach.
 
Flap gate:
width: 18,0m
water level: 3,2m
Flap gate Hönigtal General view of the Hydropower Plant Hönigtal from tailwater.
Installation of the flap gate at the erection site (erection phase) Flap gate Hönigtal
Flap gate Hönigtal
<--------
Flap gate in operation
 
Underside of the overflow
-------->
Flap gate Hönigtal

© Copyright Radhuber Consulting,
Last update 15.11.2005