Refurbishment of the trash rake raking machine

logo.gif (3626 Byte)

 

St. Dionysen Hydropower Plant

Trash rack raking machine before reconstruction.

width of rake: approx. 3.0m

RRM St. Dionysen alt

RRM St. Dionysen neu 1.jpg

RRM St. Dionysen neu 2.jpg

Trash rack raking machine after reconstruction.

Reconstruction works:
- general overhaul of the machine
- automatic operation
- container with hydraulical trash removing system
- installation of a crane

 