Hydraulic steel structure Vila Viçosa Hydropower Plant (Portugal) logo.gif (3626 Byte)

In 1988 the legal properties changed at Portugal and time was ready for the Hidrocentrais Reunidas SA to build two new hydropower stations near the villages of Ermida und Vila Viçosa. These two new Hydropower stations were set into operation in April resp. Mai 1993. The Hydropower Plant Vila Viçosa is located near the village Castelo de Paiva (southeast of Porto) at the river Rio Ardena, which also flows into the river Rio Paiva. The reason for installing this flap gate was the raising of the headwater level for this Hydropower station.
 
Flap gate:
width: 21,0m
water level: 2,5m
Klappe Villa Viçosa
<-------
Assembly of the flap gate on site (erection phase)
 
Preparation for the side plates
(the available space is very limited)
------>
Seitenschild Villa Viçosa
 
after completion
------->
Klappe Vila Viçosa Klappe Vila Viçosa after completion
<-------
 