Additional to the flap gate of this Hydropower Plant Retznei all other hydraulic steel structure (intake stop logs, draft tube stop logs, sluice gates and so on) were developed and constructed. Some of these parts are shown below.
 
HPP Retznei
<-----
Intake stop log storage
 
Installed intake stop logs
before the erection site is watered
----->
HPP Retznei
Transport of the intake stop log from the storage for lifting HPP Retznei HPP Retznei Lifting of the intake stop log with the trash rack cleaning machine
 
HPP Retznei HPP Retznei  
Installed draft tube stop log Installation of the draft tube stop log  