Hydraulic steel structure Leoben Hydropower Plant logo.gif (3626 Byte)

In the city of Leoben/Styria the owners Stadtwerke Leoben/Verbund AHP build a new Small Hydropower Station. Additional to all other hydraulic steel structure the intake and draft tube stop logs were delivered.
 
 
Intake stop log
KW Leoben Manufacturing of the intake stop logs at the shop KW Leoben
Intake stop logs installed at the power plant. KW Leoben KW Leoben View behind the intake stop log - the clearance between
the stop log and the intake screen is very good visible
 
Draft tube stop log
KW Leoben KW Leoben KW Leoben
Draft tube stop logs Draft tube stop logs Draft tube stop log,
view inside the draft tube
 
Weir stop log
KW Leoben KW Leoben KW Leoben KW Leoben
Weir stop log storage Weir stop log at positioning Lowering of the weir stop log
 
KW Leoben KW Leoben KW Leoben
Lifting Water drain hole Weir stop log back to storage

© Copyright Radhuber Consulting,
Last update 05.09.2006