At the river Mürz near the city of Kapfenberg/Styria this Small Hydropower Plant called HPP Diemlach was errected. For this Hydropower Plant the whole hydraulic steel structure was developed and constructed.
Flap gate:
width: 20m
water level: 3,6m |
|
General view of HPP Diemlach from tailwater |
|
General view from head water of HPP Diemlach (erection phase) |
|
General view from head water of HPP Diemlach (after completion) |
|
The influence of the flow disturber is very good visible |
|
|
It is very important to guarantee the lateral aeration of the flap gate in each position. |
|
Load test of the flap gate due to
flood (June 96), the lateral aeration of the flap gate is still in operation and working as we can see. |
|