Trash rack cleaning machine Werfen/Pfarrwerfen Hydropower Plant logo.gif (3626 Byte)

Near the city of Werfen at the province of Salzburg the Salzburg AG and Verbund - Austrian Hydro Power AG installed a new Run-off River Hydropower Plant. The following pictures show different stages of the trash rack cleaning machine of this plant.
 
Pictures of the site assembly
The individual components where delivered at site and assembled professional.
 
KW Werfen KW Werfen KW Werfen
KW Werfen KW Werfen
KW Werfen KW Werfen KW Werfen
KW Werfen
 
At the start of operation

of the trash rack cleaning machine all functional tests were commissioned.
 
KW Werfen  KW Werfen At the commissioning the functionality ot the hydraulic jib was tested.
KW Werfen  KW Werfen  KW Werfen
KW Werfen    
KW Werfen  KW Werfen The hydraulic jib can be used to set the stop logs of the Hydropower Plant.
 
Cleaning of the trash rake
KW WerfenKW WerfenKW Werfen
KW WerfenKW Werfen
 
At the opening day

the Hydropower Plant and the trash rack cleaning machine presenting from their best side.
 
KW Werfen KW Werfen KW Werfen
KW Werfen KW Werfen
 
Main construction data:
Cleaning depth approx. 15m
Load capacity at 15m throat 15kN
Cycle time for one trash rake < 15min